See llms.txt for all machine-readable content.
Upload a construction photo via web form โ get a detailed cost estimate with work breakdown, resource costs, and professional HTML report. Powered by GPT-4 Vision and the open-source DDC CWICR database (55,000+ work items).
Supports 9 regions: ๐ฉ๐ช Berlin ยท ๐ฌ๐ง Toronto ยท ๐ท๐บ St. Petersburg ยท ๐ช๐ธ Barcelona ยท ๐ซ๐ท Paris ยท ๐ง๐ท Sรฃo Paulo ยท ๐จ๐ณ Shanghai ยท ๐ฆ๐ช Dubai ยท ๐ฎ๐ณ Mumbai
โโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโ
โ Web Form โ โ โ STAGE 1 โ โ โ STAGE 4 โ โ โ Loop Works โ
โ Photo+Lang โ โ GPT-4 Vision โ โ Decompose โ โ per item โ
โโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโ
โ โ โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ Identify room, elements, fixtures, dimensions โ
โ โ Break down into 15-40 construction work items โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ
โโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโ
โ HTML Report โ โ โ STAGE 7.5 โ โ โ STAGE 5 โ โ โ Qdrant โ
โ Response โ โ Aggregate โ โ Parse+Score โ โ Vector DB โ
โโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโโ โโโโโโโโโโโโโโโโ
Pipeline stages:
| Stage | Node | Description |
|---|---|---|
| 1 | GPT-4 Vision | Analyzes photo: room type, elements, materials, dimensions |
| 4 | GPT-4 Decompose | Breaks elements into work items with quantities |
| 5 | Vector Search + Score | Finds matching rates in DDC CWICR, quality scoring |
| 7.5 | Aggregate & Validate | Sums costs, groups by phase, validates results |
| 9 | HTML Report | Generates professional estimate document |
| Component | Requirement |
|---|---|
| n8n | v1.30+ with Form Trigger support |
| OpenAI API | GPT-4 Vision + Embeddings access |
| Qdrant | Vector DB with DDC CWICR collections |
| DDC CWICR Data | github.com/datadrivenconstruction/DDC-CWICR |
Load DDC CWICR embeddings for your target regions:
DE_BERLIN_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
ENG_TORONTO_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
RU_STPETERSBURG_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
ES_BARCELONA_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
FR_PARIS_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
PT_SAOPAULO_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
ZH_SHANGHAI_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
AR_DUBAI_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
HI_MUMBAI_workitems_costs_resources_EMBEDDINGS_3072_DDC_CWICR
https://your-n8n/form/photo-estimate-pro-v3| Feature | Description |
|---|---|
| ๐ธ Photo Analysis | GPT-4 Vision identifies room type, elements, fixtures |
| ๐ Dimension Estimation | Uses reference objects (doors, tiles) for sizing |
| ๐ง Work Decomposition | Breaks down to 15-40 specific work items |
| ๐ฏ Quality Scoring | Rates match quality (high/medium/low/not_found) |
| ๐ Phase Grouping | PREPARATION โ MAIN โ FINISHING โ MEP |
| ๐ฐ Cost Breakdown | Labor, materials, machines per item |
| โ Validation | Warns if <50% rates found or missing demolition |
| ๐ 9 Languages | Full localization + regional pricing |
| Field | Type | Options |
|---|---|---|
| ๐ท Upload Photo | File | .jpg, .png, .webp |
| ๐ Region & Language | Dropdown | 9 regions with currencies |
| ๐๏ธ Work Type | Dropdown | New / Renovation / Repair / Auto |
| ๐ Description | Textarea | Optional context |
Input: Bathroom photo (renovation)
Region: ๐ฉ๐ช German - Berlin (EUR โฌ)
Generated Work Items:
PREPARATION (3 items)
โโโ Demolition of wall tiles โ 12 mยฒ โ โฌ180
โโโ Demolition of floor tiles โ 4.5 mยฒ โ โฌ95
โโโ Disposal of construction waste โ 0.8 mยณ โ โฌ120
MAIN (8 items)
โโโ Floor waterproofing โ 4.5 mยฒ โ โฌ225
โโโ Wall waterproofing wet zone โ 8 mยฒ โ โฌ280
โโโ Floor screed โ 4.5 mยฒ โ โฌ135
โโโ Wall tiling โ 22 mยฒ โ โฌ880
โโโ Floor tiling โ 4.5 mยฒ โ โฌ225
โโโ Toilet installation โ 1 pcs โ โฌ320
โโโ Sink installation โ 1 pcs โ โฌ185
โโโ Shower cabin installation โ 1 pcs โ โฌ450
FINISHING (3 items)
โโโ Ceiling painting โ 4.5 mยฒ โ โฌ68
โโโ Grouting โ 26.5 mยฒ โ โฌ133
โโโ Silicone sealing โ 8 m โ โฌ48
MEP (4 items)
โโโ Socket installation โ 2 pcs โ โฌ90
โโโ Light point installation โ 2 pcs โ โฌ120
โโโ Mixer/faucet installation โ 2 pcs โ โฌ160
โโโ Ventilation installation โ 1 pcs โ โฌ85
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
TOTAL: โฌ3,799.00
Labor: โฌ1,520 ยท Materials: โฌ1,900 ยท Machines: โฌ379
Quality: 78% high match ยท 18 work items
| Score | Level | Meaning |
|---|---|---|
| 60-100 | ๐ข High | Exact match with resources |
| 40-59 | ๐ก Medium | Good match, minor differences |
| 20-39 | ๐ Low | Partial match, review needed |
| 0-19 | ๐ด Not Found | No suitable rate found |
Scoring factors:
AI ยท Data Extraction ยท Document Ops ยท Files & Storage
photo-analysis, gpt-4-vision, construction, cost-estimation, qdrant, vector-search, form-trigger, html-report, multilingual
DataDrivenConstruction.io
https://DataDrivenConstruction.io
[email protected]
We help construction, engineering, and technology firms implement:
Contact us to test with your data or adapt to your project requirements.
โญ Star us on GitHub! github.com/datadrivenconstruction/DDC-CWICR